You're viewing a new version of www.ctbto.org.   Give Feedback

Country Profiles

A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
Y
Z

Country

China

|

Annex 2 State*

Yes

|

Signature Date

1996-09-23

|

Ratification Date

|

Monitoring Facilties

Location Type Treaty Code Status
Beijing Infrasound IS15 Under Construction
Kunming Infrasound IS16 Installed
Beijing Radionuclide Laboratories RL06 Planned
Kunming Auxiliary Seismic AS021 Installed
Sheshan Auxiliary Seismic AS022 Installed
Lanzhou Primary Seismic PS13 Certified
Beijing Radionuclide with Noble Gas RN20 Certified
Guangzhou Radionuclide with Noble Gas RN22 Certified
Hailar Primary Seismic PS12 Certified
Baijiatuan Auxiliary Seismic AS020 Installed
Lanzhou Radionuclide RN21 Certified
Xi'an Auxiliary Seismic AS023 Installed

Additional Information

Workshops and seminars hosted (selection):

  • 2009 National Data Centre Evaluation Workshop from 18 to 23 May 2009, Beijing
  • Technical Training Programme for Radionuclide Station Operators with ORTEC Equipment from 4 to 6 June 2007, Beijing
  • Technical Training Programme for Seismic Station Operators from 29 June to 2 July 2002, Hailar
  • Technical Training Programme for Radionuclide Station Operators from 29 June to 2 July 2002, Guangzhou
  • Introductory Training Programme for Station Operators from 24 to 28 June 2002
  • Regional Workshop for CTBTO International Cooperation and National Implementation/Ratification Procedures from 6 to 8 June 2000, Beijing

Articles on China station certifications (2017)

First IMS station certified in China, 16 December 2016, Lanzhou, China

Facility Agreement to be concluded.